Exigere Offices, London

Craig Stead • 13 November 2026

Creating a Connected Workplace at Old Street

Background

Located at Morlands on Old Street in London, Exigere wanted a modern office environment that combined high-quality lighting with intelligent building technology. Working alongside Formation Lighting and PIP, Mymesh delivered a fully wireless lighting control solution that provides flexibility, energy efficiency and enhanced occupant comfort.

Challenge

The project required a control solution capable of supporting a contemporary office fit-out while avoiding the complexity and cost associated with traditional wired control systems. The client wanted the ability to manage lighting efficiently throughout open-plan workspaces, meeting rooms and collaboration areas while also providing a platform for future smart-building functionality.

Solution

Mymesh provided a wireless control platform incorporating 77 connected luminaires, occupancy sensing, emergency lighting monitoring, wireless switching and cloud-connected management tools. The system was complemented by air quality monitoring, a touchscreen user interface and Ethernet gateway connectivity, creating a scalable smart office infrastructure.



Using the self-healing Mymesh wireless network, devices communicate directly with one another without the need for additional control wiring, simplifying installation and future changes to the workspace.

Benefits

The Exigere office now benefits from a flexible lighting control system that supports efficient space utilisation, improved user comfort and simplified facilities management. Through integrated monitoring and wireless control, the building has a future-ready digital backbone that can evolve alongside changing workplace requirements.

Client: Exigere

Electrical contractor: PIP

Luminaire manufacturer: Formation Lighting

SHARE

by Ashley Bateup • 12 August 2026
Join us on the Smart Building show
by Jasper Hijink • 11 May 2026
Exciting News...
by Jasper Hijink • 9 September 2025
Extended IASME IoT Cyber Assurance Certification (Level 2)
by Jasper Hijink • 7 September 2025
The Norwich Community Hospital Willow Therapy Unit is open
by Jasper Hijink • 31 August 2025
London Business School adopts Mymesh for refurbishment of the Plowden Building
by Jasper Hijink • 31 August 2025
Cabot Circus Shopping Centre - Bristol
by Jasper Hijink • 7 August 2025
Circular Lighting Live 2025
by Jasper Hijink • 30 July 2025
Empower your Mymesh installation with innovative hardware
by Connor Felstead • 7 October 2024
St Thomas’ Hospital expands with The Core
MORE POSTS